We are an office that deals with structure optimization. It is intended to determine the best solution from the point of view of a specific quality criterion, because it is intended to select the best solutions in order to minimize the construction costs of the facility.
Execution of multi-discipline design studies, including: replacement construction design with obtaining a replacement building permit, executive design, bills of quantities, Specifications for Work Accomplishment and Acceptance together with author's supervision over the implementation of the Investment for the task entitled: " Budowa Nowego Nabrzeża na Terenie Portu Gdańsk, służąca realizacji inwestycji polegającej na Rozbudowie Morskiego Terminala Kontenerowego DCT Gdańsk S.A.”.
Execution of a multi-discipline construction and executive design for a residential building. The 5-storey building houses 62 one-, two- and three-room apartments. On the underground floor there are 44 parking spaces and storage rooms. The building is equipped with intelligent ventilation that automatically adjusts its operation to the level of pollution outside, the system also has a positive effect on the temperature inside the apartments. Additional amenities include laundry, parcel locker, remote management of living functions of the apartment (power supply, heating, lighting, opening/closing), remote access to basic common functions such as entrance gates, wickets.
Preparation of complete Design Documentation for the implementation of the investment project involving the construction of a hull hall for the "Miecznik" type vessel and the construction of a production hall with an office and social building on the premises of PGZ Stocznia Wojenna Sp. z o. o
Design of a heavy steel construction factory hall equipped with 5 overhead cranes with a lifting capacity of 100 Mg, 5 overhead cranes with a lifting capacity of 25 Mg, 1 overhead crane with a lifting capacity of 20 Mg and an anti-corrosion hall equipped with one overhead crane with a lifting capacity of 25 Mg along with an office and social section.
Execution of multi-discipline design studies, including: replacement construction design, executive design, Specifications for Work Accomplishment and Acceptance together with author's supervision over the implementation of the Investment for the task called: "Rozbudowa Nadbrzeża Dworzec Drzewny w Porcie Gdańsk "
Preparation of a multi-discipline detailed design, technological start-up design, as-built documentation, operational documentation, as well as providing author's supervision over the Investment "Expansion of the Oil Terminal in Gdańsk - Stage I"
Execution of a multi-discipline construction and executive design for a residential building. In the building, on 5 floors, 61 one-, two-, three- and four-room apartments have been designed. On the ground floor there is an entrance area, a security room and a multi-car garage with 30 parking spaces.
A replacement building design and an executive design of the production hall with the social and office part, the order-picking hall, the porter's lodge, the fire protection retention tank and the transformer station building were developed.
Preparation of a multi-discipline detailed design, technological start-up design, as-built documentation, operating documentation, as well as author's supervision over the "Expansion of the Oil Terminal in Gdańsk - Stage II" project.
photo source: https://biznes.trojmiasto.pl/
Photo source:
The industrial and warehouse facility with social and office area along with the accompanying infrastructure was designed for Zakład Produktów Energoelektroniki ABB. The whole complex consists of two single-storey technological halls and a two-storey office building.
Revitalization of the post-industrial areas of the port and the Vistula embankment. The assumption includes a complex of buildings with a tourist and recreational function and a land development project with the reconstruction of fortifications, construction of a footbridge and construction of a yacht marina.
Preparation of complete multi-discipline design documentation, including a construction design and a replacement construction design, as well as calculations, selections, design of equipment, development of instructions for use and start-up for the Investment, including its individual elements, i.e. tanks, stub pipes and connection pipelines; execution of detailed designs, documentation for the approval by the Central Office of Measures, supervision documentation agreed with the Transport Technical Inspection, as-built documentation, acceptance documentation and author's supervision over the Investment until obtaining the occupancy permit.
Development of complete multi-discipline design documentation, executive and as-built designs, land development design and author's supervision over construction works for an open multi-storey car park of the "PARK & RIDE" and "PARK & GO" type in Bydgoszcz.
Execution of the detailed design, land development in terms of architecture and network for TMP, author's supervision in the above-mentioned scope and implementation of a multi-discipline construction design for the building materials factory in Reda - silicate production hall
A large-scale retail and service facility designed with accompanying infrastructure. According to its purpose, the building was divided into an office and social zone, a sales zone and a warehouse zone.
A technical opinion was prepared regarding the use of an alternative solution of welded pipes instead of seamless pipes for steel pile structures
Źródło zdjęć: https://radissonblusopot.pl/
Preparation of multi-discipline design documentation in the field of conceptual design, construction design together with obtaining a building permit decision, detailed design, cost estimate documentation, preparation of a construction design for a plant superstructure, acceptance designs, participation in obtaining the required arrangements, permits and opinions.
The project included the expansion of the production hall with a loading section and maintenance workshops, extension of the office building, construction of a porter's lodge, storage and housing for technical gases in cylinders, technical gas tanks and foundations for devices, as well as land development and the necessary technical infrastructure
Photo source: www.port.darlowo.pl/pl/infrastruktura.html
Hotel & SPA in Charzykowy. 5-story facility with swimming pools, area ~7000 m2.
Project stages:
Concept
Construction project
Executive project
Author's supervision
The work included the construction, tender and executive design of a steel warehouse hall and the design of a steel boiler room with service platforms.
Ogrody Shopping Centre in Elblag
The project in the design and build system, an underground garage and a two-storey above-ground garage.
Architecture: ESA.
Project stages:
Alternative building design
Detailed design
Author's supervision
As part of the task, a construction and executive design of the reinforced concrete and steel structure of the building consisting of the exhibition part and the service part was prepared.
Construction and executive project including the construction of a marina with accompanying infrastructure on the Pasłęka River in Nowa Pasłęka.
Photo source: https://iczarter.pl/pl/region/zalew-wislany/nowa-pasleka.html
A three-storey commercial building with a functional division into a generally accessible public part and an office and technical part. The building includes a large-format store with an unloading area, a security office and a storage room.
The car showroom building was designed together with a service and repair station for cars and motorcycles. The facility consists of six floors with various functions: administration, exhibition, social and sanitary, service and garage.
The fishing basin in the Port of Ustka along with communication infrastructure and the necessary technical infrastructure networks.
Designed commercial and service building with an internal communication system. The one-storey building houses universal pavilions for various purposes.
Reconstruction of the Elbląg Waterway on shipping routes:
Author and source of photos: Mr. Marcin Kłosiński: https://www.expresselblag.pl/artykul/7853,kanal-elblaski-z-lotu-ptaka-zdjecia
Construction and executive design for the construction industry. The facility has been functionally divided into a main sales hall, an office and social area and an entrance area.
Construction design of an inland marina with a rental and storage room for water equipment, along with a complex of buildings and related facilities. The general goal of the project is to provide comprehensive services in the field of kayaking, sailing, water sports, fishing and tourism.
The Kwidzyn Industrial and Technological Park includes a complex of buildings serving office and exhibition functions. The buildings were designed in the passive construction standard with the use of modern technologies of obtaining energy from alternative sources.
The Laboratory Center for Natural Sciences is part of the emerging Campus of the Cardinal Stefan Wyszyński University. The facility has been designed for didactic and research laboratories for physics, biology and chemistry with different purity classes, as well as a lecture and presentation room.
The entire complex consists of two buildings: the Technology and Administration Incubator and the Technology Centre. The complex was designed together with the technical infrastructure, greenery and communication system.
Preparation of a conceptual and construction design together with obtaining a building permit in BIM technology for the construction of a new seat of the Poviat Police Headquarters in Pila, together with the development of the adjacent area.
The project included 3 buildings:
A - Usable area 6,430.97 m2,
B - Usable area 1,148.30 m2,
C - Usable area 230.00 m2
The scope of the task includes the design of the production hall and social and administrative building with internal installations, buildings serving the entire assumption, as well as the communication system and arranged greenery.
A complex of facilities of the Police Headquarters in Kartuzy, containing an office building with elements of social facilities and an indoor training shooting room, as well as auxiliary facilities, technical infrastructure, greenery and communication system.
Revitalization of the post-industrial areas of the port and the Vistula embankment. The assumption includes a complex of buildings with a tourist and recreational function and a land development project with the reconstruction of fortifications, construction of a footbridge and construction of a yacht marina.
Illumination project for one of the most important bridges in Warsaw with the use of LED luminaires that enable RGB colour control, free programming of lighting and its free change depending on the needs.
The scope of the study includes the concept, construction design, executive design and author's supervision of the investment consisting in the reconstruction and modernization of the existing, unused G-321 post-shipyard building located in the Port of Gdynia. The facility will be adapted to the needs of the prototype workshop.
The shape of the building results from the specific functional and utility connections for this type of facilities, defined in detail by the regulations on the design of poviat police headquarters.
The modernization project of the interiors of auditoriums no. 264 and 462 is part of the project Modern Auditoriums of the Gdańsk University of Technology, co-financed by the European Union from the European Regional Development Fund.
The facility houses didactic and research laboratories for students, laboratories for multimedia technology applications and the office of the Pomeranian ICT Cluster. An interior and acoustics design for the conference room located in the building was also developed.
The designed laboratory building is characterized by a simple shape and a clear functional division. The facility was divided into three parts: a research hall, electrical rooms and auxiliary rooms located along the long side of the hall.
Construction and executive design of the modernization of the premises of the IT Services Centre of the Gdańsk University of Technology. An interior furnishing project was developed along with finishing materials, as well as a modernization project for electrical and sanitary installations.
Preparation of a conceptual, construction and executive design together with obtaining a building permit for the task entitled: "Utworzenie przychodni lekarskiej wraz ze specjalistyczną pracownią endoskopową w budynku Port Praski w Warszawie"
In the facility there has been designed:
A two-stage architectural competition for the concept of a new complex of the Podkarpackie Children's Health Centre at the Clinical Provincial HospitalNo. 2 of St. Queen Jadwiga in Rzeszow.
While shaping the form of the building, the key hospital units were centralized, making up the so-called "hot platform", i.e.: Children's Hospital Emergency Department, Children's Operating Block, Children's Intensive Care Unit, Children's Radiology and Diagnostic Imaging Department and Central Sterilization in the immediate vicinity of the existing hospital buildings, connecting them with vertical communication with the airstrip and connectors with individual bed wards. Two compact blocks intended for hospitalized patients (western and central) have been spatially separated from the block of outpatients (eastern).
The largest newly built university hospital in Central Europe, equipped with rooms for 935 patients, an integrated operating block with 20 rooms, an integrated endoscopy area with 12 rooms, an intensive care unit, a radiotherapy centre with a cybernetic knife and tomotherapy, a nuclear medicine centre with PET CT and PET MRI and SPECT CT, emergency department, hemodynamics and interventional radiology laboratory.
Design work on the largest newly built pediatric hospital in Europe. The hospital will provide comprehensive care for the youngest patients and consists of a hospital emergency department, an integrated operating block with 5 operating rooms, an integrated endoscopy laboratory, specialist clinics, as well as a highly specialized infectious diseases ward adapted to treat children with highly virulent diseases. The designed number of beds is 354 pcs.
Design work on the construction of a new seat of the Municipal Hospital in Gliwice. The utility program assumes the implementation of 12 bed wards, a complex of 11 hospital outpatient clinics, multifunctional surgeries, a hospital emergency department, and an operating block. A total of 356 hospital beds have been designed.
Multi-discipline comprehensive design works aimed at the construction of an integrated operating block at the 5th Military Clinical Hospital with the Polyclinic of SP ZOZ in Krakow.
Completion of works on the largest teaching hospital in Poland, equipped with an integrated operating block, integrated endoscopy laboratory, radiotherapy centre with two linear accelerators, a cybernetic knife and tomotherapy, a nuclear medicine facility, and a hospital emergency department.
Design works on the first stage of works aimed at creating a new university hospital in Poznań. The first of the buildings is planned as the seat of the hospital emergency department with a raised landing pad for helicopters, the intensive care unit and the integrated operating block
Development of a functional and utility program for the construction of an innovative research and clinical centre called "Proton Rad Med Bydgoszcz" along with land development. A 3-storey building was designed: with 2 usable above-ground storeys and 1 underground storey.
Development of a competitive architectural concept for the extension and adaptation of the Orthopedic and Rehabilitation Clinical Hospital of Wiktor Dega in Poznań. The concept assumed the construction of a hospital building in place of the existing orthopedic clinics and a power generator, which are to be demolished. Between the designed building and the existing hospital, a link connecting the level of the first floor and the level of the planned operating block has been provided. The concept also provided for the construction of a connector at the level of the underground storey.
Design work on the modernization, reconstruction and extension of the hospital, the aim of which is to raise the level of services provided in the leading hospital in the capital. The scope of work includes the design of a new emergency room, diagnostic imaging facility, central sterilization unit, intensive care unit and an integrated operating block.
The development includes preparation of a construction project for the "Construction of an operating block with a central sterilization room", which is functionally connected to the main building of the hospital through a connector on the ground floor and first floor.
In addition to the construction of the operating block, the project also included, among others:
Completion of works on the largest teaching hospital in Poland, equipped with an integrated operating block, integrated endoscopy laboratory, radiotherapy centre with two linear accelerators, a cybernetic knife and tomotherapy, a nuclear medicine facility, a hospital emergency department with a helipad.
The new headquarters for some of the wards of the Provincial Children's Hospital includes, among others Intensive Care Unit, Hospital Emergency Department, Operating Theater with a central sterilization room, hospital pharmacy and a chapel designed strictly according to technological guidelines.
The first stage of the expansion of the Independent Public Health Care Facility, assuming the expansion of the emergency room with a new building and its reconstruction in the existing wing of the hospital. The scope of the study covers the ground floor of the designed and rebuilt facility.
Construction of a health care building with a connecting building - a pavilion for the needs of the gynecology and obstetrics ward, containing: technical part with the archive, admission room, clinics, delivery ward, neonatology ward, obstetrics ward, gynecology ward, oncology gynecology ward, communication link with the existing hospital building.
Development of the existing Non-Public Health Care Facility with a psychiatric ward of the Nursing and Treatment Facility. The new part will be a ward dedicated mainly to the rehabilitation of the elderly people. 93 beds have been designed, arranged in double rooms on two floors.
Development of comprehensive documentation for the design of a new, four-story building of the Oncohematology Department and the extension to the existing Brachytherapy building of a bunkered operating room with facilities and equipment.
The facility is an extension and superstructure of a technical building, located in the central part of the existing Ministry of Internal Affairs hospital complex. Individual rooms and departments have been designed in accordance with technological guidelines.
The building has over nine thousand square meters, six above-ground storeys and one underground storey, where there will be a parking lot. As part of the investment, we made, among others, a multi-functional lecture hall, seminar rooms, exercise rooms as well as didactic and pre-clinical rooms within individual departments and departments. There are also dental offices for standard and specialist treatment, together with a room for procedures under general anesthesia.
Every day, around 500 Polish students of medicine and dentistry are educated in the facility, and patients who have gained access to comprehensive and modern treatment in one place are admitted. All design work was, of course, done in BIM technology
|